6 Lane Elevated Corridor from Paradise Junction to ORR Junction on Hyderabad – Karimnagar – Ramgundam Road
Location: Telangana, India
Type: Type of Superstructure: Segmental Box Girder with External Post-
tensioning
Total Length of Elevated Corridor: 11.120 km (6 Lane elevated structure) Detailed Project Report for Construction of Elevated corridor at the congested areas & widening of the existing road to Six lane with Two lane Service roads on either side in open areas from Paradise junction to OR junction on Hyderabad – Karimnagar, Ramagundam road in the State of Telangana
Scope of Work: Detailed Designs
Client: Roads & Buildings Department (R&B), Govt. of Telangana
Completion: Ongoing
Know More