Author: admin

Architects Engineers and Consultants

DFCCIL Eastern Corridor Sahnewal to Pilkhani

Location: Sahnewal, Punjab to Pilkhani, Uttar Pradesh Type: Route Length: 175km; Gauge: Broad Gauge Loading Standard: 32.5T; Important Bridges: 2 Nos.; Bridge Over River Yamuna: 7x 61.0 m; Bridge Over River Markanda: 6x 45.7 m; Major Bridges: 46 Nos.; Minor Bridges & RUBs: 148 Nos.; Stations: 14 Nos. Scope of Work: Design of Track, Formation,…
Read more

6 Lane Elevated Corridor from Paradise Junction to ORR Junction on Hyderabad – Karimnagar – Ramgundam Road

Location: Telangana, India Type: Type of Superstructure: Segmental Box Girder with External Post- tensioning Total Length of Elevated Corridor: 11.120 km (6 Lane elevated structure) Detailed Project Report for Construction of Elevated corridor at the congested areas & widening of the existing road to Six lane with Two lane Service roads on either side in…
Read more

Extra Dosed Bridge Across River Narmada

Location: Gujarat, IndiaType: Extra Dosed BridgeScope of work: Authoritys EngineerClient: National Highways Authority of India, New DelhiCompletion: December 2016

Hello world!

Welcome to WordPress. This is your first post. Edit or delete it, then start writing!