Key Projects

Matanda Irrigation Scheme

Location: Uganda
Type: Concrete dam of 22m height with Ogee Spillway and Piped
Distribution Network for 4200 hectares.
Scope of Work: Detailed Designs
Client: Ministry of Water & Environment, Republic of Uganda
Completion: June 2022
Know More


Laungwa Bridge on Great East Road (T4)

Location: Zambia
Type: The Luangwa Bridge carries the Great East Road across the Luangwa River approximately 230 km east of Lusaka City. This cable-stayed bridge was built in 1968 and has a 9.8 m wide steel-reinforced concrete deck, composite with transverse floor beams; two, 42 m high, steel pylons and supported by coiled bridge cable stays. The main span is 222 m with approach spans are of 40 m each. The bridge is currently operational with only one heavy vehicle at a time with a maximum vehicle weight 55 tons traveling at a speed of 30 km/hr.
Scope of Work: Feasibility Study
Client: Zambia Road Authority
Know More


Parbatipur Kaunia

Location: Bangladesh
Type: Conversion of Meter Gauge Line into Dual
Gauge from Parbatipur to Kaunia Section of Bangladesh Railway; Length-57 km Main Line and 9.85 km Loop Line; Gauge – Dual Gauge (MG and BG)
Scope of Work: Feasibility Study, Detailed Engineering Design, Bidding services and Construction Supervision
Client: Bangladesh Railway
Completion: 2028
Know More


Extra Dosed Bridge Across River Narmada
Extra Dosed Bridge Across River Narmada

Location: Gujarat, India
Type: Extra Dosed Bridge
Scope of work: Authoritys Engineer
Client: National Highways Authority of India, New Delhi
Completion: December 2016
Know More


Mizan – Dima – Boma Road Upgrading Project

Location: Ethiopia
Type: World Bank Funded Project. 4-lane divided carriageway in urban sections of length 16 km being executed in a very tough terrain with hostile solid conditions. Project Length: 2 Laning of 91.60 km
Scope of Work: Construction Supervision
Client: Ethiopian Road Authority
Know More


Ahmedabad Vadodara of NH-8

Location: Gujarat, India
Type: This is a 102.3 km long 6 lane highway which includes 4 major bridges including 560m long bridge on Mahi river. The Project also includes Operation and Maintenance of 93 km long Expressway (NE-1). The project was completed 27 days ahead of schedule. The Project was awarded “The best Project (Overall)” by NHAI in 2016.
Scope of Work: Supervision
Client: National Highways Authority of India (NHAI)
Completion: Completed/In use
Know More


6 Lane Elevated Corridor from Paradise Junction to ORR Junction on Hyderabad – Karimnagar – Ramgundam Road

Location: Telangana, India
Type: Type of Superstructure: Segmental Box Girder with External Post-
tensioning
Total Length of Elevated Corridor: 11.120 km (6 Lane elevated structure) Detailed Project Report for Construction of Elevated corridor at the congested areas & widening of the existing road to Six lane with Two lane Service roads on either side in open areas from Paradise junction to OR junction on Hyderabad – Karimnagar, Ramagundam road in the State of Telangana
Scope of Work: Detailed Designs
Client: Roads & Buildings Department (R&B), Govt. of Telangana
Completion: Ongoing
Know More